The Public Port Authority of Andalusia has awarded Ecocomputer the contract for the preventive, corrective, predictive and technological maintenance of the surveillance and control systems for access to the ports and docks of the ports under its management for a period of four years.
The current access control system, obsolete and with important operational problems, will be gradually replaced by our ACTAIS® platform, integrating the existing hardware in the installations.
Ports maintained within the contract:
|
|